{"id":803,"date":"2026-06-09T14:24:21","date_gmt":"2026-06-09T12:24:21","guid":{"rendered":"https:\/\/www.icmcave.com\/casi-studio\/ampliamento-del-canale-di-panama\/"},"modified":"2026-07-03T09:30:57","modified_gmt":"2026-07-03T07:30:57","slug":"expansion-of-the-panama-canal","status":"publish","type":"casi-studio","link":"https:\/\/www.icmcave.com\/en\/case-studies\/expansion-of-the-panama-canal\/","title":{"rendered":"Expansion of the Panama Canal"},"content":{"rendered":"<h2>The challenge: aggregates for one of the major infrastructure projects of the century<\/h2>\n<p><strong>The expansion of the Panama Canal <\/strong>is one of the most ambitious infrastructure projects of the 21st century. Enormous quantities of high-quality aggregates were required to build the new containment chambers on the Pacific and Atlantic coasts, for use in the production of structural concrete.<\/p>\n<p>The challenge was not just one of scale, as time was of the essence. The project schedule left no room for error: the aggregates had to be produced on site, at full capacity, using <strong>crushing and screening systems <\/strong>that had to be designed, built, shipped, assembled and commissioned within an extremely tight timeframe.<\/p>\n<p>ICM has been selected to design and deliver <strong>two complete system<\/strong>: one in Miraflores, on the Pacific side, and one in Gat\u00fan, on the Atlantic side. Total value of the contract: 37 million dollars.<\/p>\n<h2>The ICM approach: engineering systems, not just plants<\/h2>\n<p><strong>First the materials, then the machines<\/strong><\/p>\n<p>Every ICM project begins with a <strong>process study<\/strong>: an in-depth analysis of the input material, the required product classes and the necessary production volumes. For Panama, this meant designing two systems capable of producing <strong>certified aggregates for structural concrete<\/strong> with a combined instantaneous capacity of the two plants of 4,800 t\/h, and consistent, controllable particle size distributions.<\/p>\n<p>The quarry was treated as a system: from the rock at the quarry face right through to the finished aggregate classes at the concrete plant. An <strong>integrated process designed to reduce waste<\/strong>, eliminate unnecessary handling and maximise the amount of material produced per tonne of rock extracted.<\/p>\n<p><strong>Modular engineering: designed in Italy, assembled in Panama<\/strong><\/p>\n<p>One of the distinctive features of the Panama project was its engineering-based approach to construction and logistics. ICM designed the entire system using modular, bolted steel structures manufactured in Italy and shipped to Panama.<\/p>\n<p><strong>290 containers <\/strong>left Italy carrying the components for the two complete plants. The structures were engineered with pre-drilled connections and standardised interfaces: on-site assembly did not require any welding, thereby drastically reducing time, costs and the need for skilled labour on site.<\/p>\n<p>On the Pacific coast alone, <strong>the pre-assembly area covered 30,000 m<\/strong><strong><sup>2<\/sup><\/strong> where components were positioned, checked and prepared before being hoisted into their final positions.<\/p>\n<p>The same applied to the Atlantic coast, which had a smaller pre-assembly area.<\/p>\n<p><strong>Speed as a result of the method<\/strong><\/p>\n<p>The system was <strong>built and shipped from Italy in just 4 months<\/strong>, between February and May 2010. On-site installation and commissioning at both sites were completed within six months, from June to December 2010.<\/p>\n<p>This record-breaking timeframe was achieved thanks to a <strong>structured engineering approach<\/strong>: standardised components, carefully planned logistics, software for mapping parts on site &#8211; which eliminated downtime spent searching for materials across a 30,000 m\u00b2 site &#8211; and a project management process that left no room for improvisation.<\/p>\n<h2>The results: a record that still stands<\/h2>\n<p>The <strong>Miraflores <\/strong>system, with a production capacity of 3,300 t\/h, remains one of the largest and fastest crushing and screening systems ever delivered worldwide. The <strong>Gatun <\/strong>system added a further 1,500 t\/h on the Atlantic side, bringing the total installed capacity to 4,800 t\/h across the two sites.<\/p>\n<p>Both systems produced the <strong>aggregates required for the structural concrete <\/strong>of one of the most demanding engineering projects in modern history. The expansion of the <strong>Panama Canal <\/strong>was inaugurated in June 2016.<\/p>\n<p>For <strong>ICM<\/strong>, the Panama project was the clearest demonstration of what the company\u2019s design philosophy can achieve at the highest level of complexity: a system designed around the process, not around individual machines, delivered with a speed and precision that only a structured approach can achieve.<\/p>\n<h2>Are you planning a crushing and screening system?<\/h2>\n<p>Whether you are planning a new system , considering a significant expansion of capacity or managing the supply of aggregates for a major infrastructure project, the ICM approach always starts with the same question: what is your material and what is your production target? Everything else is built on that foundation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The expansion of the Panama Canal is one of the most ambitious infrastructure projects of the 21st century. Enormous quantities of high-quality aggregates were required to build the new containment chambers on the Pacific and Atlantic coasts, for use in the production of structural concrete.<\/p>\n","protected":false},"featured_media":805,"template":"","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"class_list":["post-803","casi-studio","type-casi-studio","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Crushing system at the Panama Canal | ICM Cave<\/title>\n<meta name=\"description\" content=\"ICM designed and delivered two crushing and screening systems for the expansion of the Panama Canal: 3,300 t\/h on the Pacific, 1,500 t\/h on the Atlantic.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.icmcave.com\/en\/case-studies\/expansion-of-the-panama-canal\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Crushing system at the Panama Canal | ICM Cave\" \/>\n<meta property=\"og:description\" content=\"ICM designed and delivered two crushing and screening systems for the expansion of the Panama Canal: 3,300 t\/h on the Pacific, 1,500 t\/h on the Atlantic.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.icmcave.com\/en\/case-studies\/expansion-of-the-panama-canal\/\" \/>\n<meta property=\"og:site_name\" content=\"ICM\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-03T07:30:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.icmcave.com\/wp-content\/uploads\/2026\/06\/icm-panama-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1485\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.icmcave.com\\\/en\\\/case-studies\\\/expansion-of-the-panama-canal\\\/\",\"url\":\"https:\\\/\\\/www.icmcave.com\\\/en\\\/case-studies\\\/expansion-of-the-panama-canal\\\/\",\"name\":\"Crushing system at the Panama Canal | ICM Cave\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.icmcave.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.icmcave.com\\\/en\\\/case-studies\\\/expansion-of-the-panama-canal\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.icmcave.com\\\/en\\\/case-studies\\\/expansion-of-the-panama-canal\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.icmcave.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/icm-panama-1.jpg\",\"datePublished\":\"2026-06-09T12:24:21+00:00\",\"dateModified\":\"2026-07-03T07:30:57+00:00\",\"description\":\"ICM designed and delivered two crushing and screening systems for the expansion of the Panama Canal: 3,300 t\\\/h on the Pacific, 1,500 t\\\/h on the Atlantic.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.icmcave.com\\\/en\\\/case-studies\\\/expansion-of-the-panama-canal\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.icmcave.com\\\/en\\\/case-studies\\\/expansion-of-the-panama-canal\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.icmcave.com\\\/en\\\/case-studies\\\/expansion-of-the-panama-canal\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.icmcave.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/icm-panama-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.icmcave.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/icm-panama-1.jpg\",\"width\":1485,\"height\":720},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.icmcave.com\\\/en\\\/case-studies\\\/expansion-of-the-panama-canal\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.icmcave.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Casi studio\",\"item\":\"https:\\\/\\\/www.icmcave.com\\\/en\\\/case-studies\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Expansion of the Panama Canal\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.icmcave.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.icmcave.com\\\/en\\\/\",\"name\":\"ICM\",\"description\":\"Aggregates solutions\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.icmcave.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.icmcave.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.icmcave.com\\\/en\\\/#organization\",\"name\":\"ICM\",\"url\":\"https:\\\/\\\/www.icmcave.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.icmcave.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.icmcave.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/icm-favicon.png\",\"contentUrl\":\"https:\\\/\\\/www.icmcave.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/icm-favicon.png\",\"width\":301,\"height\":300,\"caption\":\"ICM\"},\"image\":{\"@id\":\"https:\\\/\\\/www.icmcave.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Crushing system at the Panama Canal | ICM Cave","description":"ICM designed and delivered two crushing and screening systems for the expansion of the Panama Canal: 3,300 t\/h on the Pacific, 1,500 t\/h on the Atlantic.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.icmcave.com\/en\/case-studies\/expansion-of-the-panama-canal\/","og_locale":"en_US","og_type":"article","og_title":"Crushing system at the Panama Canal | ICM Cave","og_description":"ICM designed and delivered two crushing and screening systems for the expansion of the Panama Canal: 3,300 t\/h on the Pacific, 1,500 t\/h on the Atlantic.","og_url":"https:\/\/www.icmcave.com\/en\/case-studies\/expansion-of-the-panama-canal\/","og_site_name":"ICM","article_modified_time":"2026-07-03T07:30:57+00:00","og_image":[{"width":1485,"height":720,"url":"https:\/\/www.icmcave.com\/wp-content\/uploads\/2026\/06\/icm-panama-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.icmcave.com\/en\/case-studies\/expansion-of-the-panama-canal\/","url":"https:\/\/www.icmcave.com\/en\/case-studies\/expansion-of-the-panama-canal\/","name":"Crushing system at the Panama Canal | ICM Cave","isPartOf":{"@id":"https:\/\/www.icmcave.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.icmcave.com\/en\/case-studies\/expansion-of-the-panama-canal\/#primaryimage"},"image":{"@id":"https:\/\/www.icmcave.com\/en\/case-studies\/expansion-of-the-panama-canal\/#primaryimage"},"thumbnailUrl":"https:\/\/www.icmcave.com\/wp-content\/uploads\/2026\/06\/icm-panama-1.jpg","datePublished":"2026-06-09T12:24:21+00:00","dateModified":"2026-07-03T07:30:57+00:00","description":"ICM designed and delivered two crushing and screening systems for the expansion of the Panama Canal: 3,300 t\/h on the Pacific, 1,500 t\/h on the Atlantic.","breadcrumb":{"@id":"https:\/\/www.icmcave.com\/en\/case-studies\/expansion-of-the-panama-canal\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.icmcave.com\/en\/case-studies\/expansion-of-the-panama-canal\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.icmcave.com\/en\/case-studies\/expansion-of-the-panama-canal\/#primaryimage","url":"https:\/\/www.icmcave.com\/wp-content\/uploads\/2026\/06\/icm-panama-1.jpg","contentUrl":"https:\/\/www.icmcave.com\/wp-content\/uploads\/2026\/06\/icm-panama-1.jpg","width":1485,"height":720},{"@type":"BreadcrumbList","@id":"https:\/\/www.icmcave.com\/en\/case-studies\/expansion-of-the-panama-canal\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.icmcave.com\/en\/"},{"@type":"ListItem","position":2,"name":"Casi studio","item":"https:\/\/www.icmcave.com\/en\/case-studies\/"},{"@type":"ListItem","position":3,"name":"Expansion of the Panama Canal"}]},{"@type":"WebSite","@id":"https:\/\/www.icmcave.com\/en\/#website","url":"https:\/\/www.icmcave.com\/en\/","name":"ICM","description":"Aggregates solutions","publisher":{"@id":"https:\/\/www.icmcave.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.icmcave.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.icmcave.com\/en\/#organization","name":"ICM","url":"https:\/\/www.icmcave.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.icmcave.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.icmcave.com\/wp-content\/uploads\/2026\/06\/icm-favicon.png","contentUrl":"https:\/\/www.icmcave.com\/wp-content\/uploads\/2026\/06\/icm-favicon.png","width":301,"height":300,"caption":"ICM"},"image":{"@id":"https:\/\/www.icmcave.com\/en\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.icmcave.com\/en\/wp-json\/wp\/v2\/casi-studio\/803","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.icmcave.com\/en\/wp-json\/wp\/v2\/casi-studio"}],"about":[{"href":"https:\/\/www.icmcave.com\/en\/wp-json\/wp\/v2\/types\/casi-studio"}],"version-history":[{"count":4,"href":"https:\/\/www.icmcave.com\/en\/wp-json\/wp\/v2\/casi-studio\/803\/revisions"}],"predecessor-version":[{"id":811,"href":"https:\/\/www.icmcave.com\/en\/wp-json\/wp\/v2\/casi-studio\/803\/revisions\/811"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.icmcave.com\/en\/wp-json\/wp\/v2\/media\/805"}],"wp:attachment":[{"href":"https:\/\/www.icmcave.com\/en\/wp-json\/wp\/v2\/media?parent=803"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}